We were contacted by Cambridge Orthodontic Practice to deal with a leak on some of their pipe work. After diagnosing the fault our Engineers recommended installation of a new stainless steel indirect unvented hot water cylinder (150 litre) in a cupboard.
We removed the old cylinder and pipework, and installed the new cylinder and thermostat. The pipes were then reconnected to the new cylinder and an immersion power cable was installed.